Canal Crossing Applications & Standard Drawing Sets

Scroll down to locate the crossing applications and standard drawing sets for each canal company.

Utah Lake Distributing Company – Riverton Branch

Anyone desiring to cross the canal with a structure (utility) or encroach inside the existing right-of-way needs to secure an encroachment agreement.

The following form may be downloaded for your convenience. If you need assistance completing this application, please call us at (801) 756-0309 or contact us by email ([email protected]).

A public map of the irrigation company system has been created to ease the encroachment application process. Applicants may use this map as a reference, but should also make reasonable efforts to verify facility locations in the field. To access the ULDC system map, click here.

Application Packet (ULDC-R) Standard Drawing Set (ULDC)

Utah Lake Distributing Company – Saratoga Branch

Anyone desiring to cross the canal with a structure (utility) or encroach inside the existing right-of-way needs to secure an encroachment agreement.

The following form may be downloaded for your convenience. If you need assistance completing this application, please call us at (801) 756-0309 or contact us by email ([email protected]).

A public map of the irrigation company system has been created to ease the encroachment application process. Applicants may use this map as a reference, but should also make reasonable efforts to verify facility locations in the field. To access the ULDC system map, click here.

Application Packet (ULDC-S) Standard Drawing Set (ULDC)

Springville Irrigation & Drainage Group

Group facilities include a system of ditches that deliver water and underground drain lines throughout the service area. Anyone desiring to cross these facilities with a structure (utility), construct subdivisions or other developments that impact the Group’s facilities, or encroach inside established rights-of-way needs to secure an encroachment agreement. If you need assistance completing this application, please call us at (801) 756-0309 or contact us by email ([email protected]).

A public map of the irrigation company system has been created to ease the encroachment application process. Applicants may use this map as a reference, but should also make reasonable efforts to verify facility locations in the field. To access the SIDG system map, click here.

Application Packet (SIDG) Standard Drawing Set (SIDG)

Mapleton Irrigation Company

Company facilities include a system of ditches that deliver water throughout the service area. Anyone desiring to cross these laterals and ditches with a structure (utility), construct subdivisions or other developments that impact the Company’s facilities, or encroach inside established rights-of-way needs to secure an encroachment agreement. New turnouts or other canal modifications also need to be applied for and accepted by the Company. If you need assistance completing this application, please call us at (801) 756-0309 or contact us by email ([email protected]).

A public map of the irrigation company system has been created to ease the encroachment application process. Applicants may use this map as a reference, but should also make reasonable efforts to verify facility locations in the field. To access the MIC system map, click here.

Application Packet (MIC) Standard Drawing Set (MIC)

East Bench Canal Company

Anyone desiring to cross the canal with a structure (utility) or encroach inside the existing right-of-way needs to secure an encroachment agreement.

The following form may be downloaded for your convenience. If you need assistance completing this application, please call us at (801) 756-0309 or contact us by email ([email protected]).

Note: These resources have recently been updated. Please ensure that you are using the 06-2023 application packet and 09-2021 standard drawings set.

A public map of the irrigation company system has been created to ease the encroachment application process. Applicants may use this map as a reference, but should also make reasonable efforts to verify facility locations in the field. To access the EBCC system map, click here.

Application Packet (EBCC) Standard Drawing Set (EBCC)

Spanish Fork South Irrigation Company

**Formerly known as South Field Irrigation Company.

Anyone desiring to cross the canal with a structure (utility) or encroach inside the existing right-of-way needs to secure an encroachment agreement.

The following form may be downloaded for your convenience. If you need assistance completing this application, please call us at (801) 756-0309 or contact us by email ([email protected]).

A public map of the irrigation company system has been created to ease the encroachment application process. Applicants may use this map as a reference, but should also make reasonable efforts to verify facility locations in the field. To access the SFSIC system map, click here.

Application Packet (SFSIC) Design Checklist (SFSIC) Standard Drawing Set (SFSIC)

Wellsville-Mendon Conservation District

Anyone desiring to cross the canal with a structure (utility) or encroach inside the existing right-of-way needs to secure an encroachment agreement.

The following form may be downloaded for your convenience. If you need assistance completing this application, please call us at (435) 754-7661 or contact us by email.

Application Packet (WMCD) Standard Drawing Set (WMCD) Water Transfer Form (WMCD) Water Transfer Form Instructions (WMCD) By-Laws (2005) (WMCD)

Benjamin Drainage District

Group facilities include a system of ditches that deliver water and underground drain lines throughout the service area. Anyone desiring to cross these facilities with a structure (utility), construct subdivisions or other developments that impact the Drainage District’s facilities, or encroach inside established rights-of-way needs to secure an encroachment agreement. If you need assistance completing this application, please call us at (801) 756-0309 or contact us by email ([email protected]).

A public map of the irrigation company system has been created to ease the encroachment application process. Applicants may use this map as a reference, but should also make reasonable efforts to verify facility locations in the field. To access the BDD system map, click here.

Application Packet (BDD)

West Field Irrigation Company

West Field Irrigation Company (WFIC) facilities include irrigation pipes, ditches, and canals throughout the service area. Anyone desiring to cross these facilities with a structure (utility), construct subdivisions or other developments that impact the WFIC’s facilities, or encroach inside established rights-of-way needs to secure an encroachment agreement. If you need assistance completing this application, please call us at 801-759-0309 or contact us by email ([email protected]).

A public map of the irrigation company system has been created to ease the encroachment application process. Applicants may use this map as a reference, but should also make reasonable efforts to verify facility locations in the field. To access the WFIC system map, click here.

Application Packet (WFIC) Standard Drawings Set (WFIC)